Amon Automation Solutions has officially completed the commissioning and startup phases for the BertschEnergy OSRC Water Tube Boiler in Oman. The plant has now successfully transitioned into its free maintenance and comprehensive support period.
This greenfield project required the deployment of a highly deterministic, fully redundant Siemens PCS 7 DCS architecture. Our engineering team handled the complete functional testing, loop checks, and hot commissioning of the boiler's critical thermal loops.
Key Commissioning Milestones
The successful startup required meticulous tuning of complex control algorithms to guarantee continuous, safe steam generation.
- Tuning of the 3-Element Drum Level Control for extreme stability under varying loads
- Implementation of Cross-Limiting Combustion Logic to optimize fuel-to-steam efficiency
- Successful synchronization of Draft Fan VFDs
With the plant now in continuous operation, our engineering team will provide dedicated support throughout the warranty period to ensure the system operates at peak efficiency.